Construction of a water treatment plant and sewer system for the Guaqui town, Department of La Paz / Municipality of Guaqui

Resumen

Información general

Autor

Roberto Méndez

Última actualización

Junio 2018

Objetivo general

Improve the current living conditions of Guaqui's inhabitants through the implementation of an appropriate sewage system, benefiting the overall population (perspective for the next 20 years)

País

  • Bolivia

Presupuesto

Bs. 7.000.000 (approximately USD 1'000'000)

Duración

September 2016 - July 2017 (approximately 10 months)

Resumen

Descripción

Due to the absence of a wastewater treatment plant treatment plant in the Guaqui town, wastewater is discharged directly to Titicaca Lake, causing serious water pollution. Through the construction of a sewage treatment plant, the water pollution will be reduced along with an improvement of the living conditions of the local population. However, as a result of frequent lake level fluctuations, the sewage treatment plant might suffer negative impacts from flooding. In addition, frosts during the cold winter months can affect the plant's main components such as (i) sewage collection network and sewer manhole, (ii) emissary, (iii) pumping sump, (iv) pumping line, (v) treatment plant, (vi) infiltration ditches.

Términos clave

  • Wastewater treatment system
  • sewage collection network
  • emissary
  • pump stations
  • lake contamination
  • Bolivia
  • Floods
  • frosts

Sectores de Intervención

  • Salud
  • Turismo
  • Agua y saneamiento

Documentos

Imágenes

Perspectiva del riesgo

Amenazas que se producen debido a la degradación del medioambiente

Nombre de la amenaza

Contaminación del agua (superficiales y subterráneas)

Exposición

No está claro

Comentarios

Domestic sewage is untreated and are discharged into the fields/grounds and lake

Consecuencia

Laminar erosion of contaminated soils and effluent infiltration could result in contamination of surface and groundwaters to the detriment of uncovered populations

Probabilidad

Improbable

Alcance

Perjudicial

Importancia del riesgo

Riesgo bajo

Nombre de la amenaza

Degradación (tierra, suelo, ecosistemas, biodiversidad)

Exposición

Comentarios

Altiplano zone with various erosional processes caused by wind (60%) and water (40%), relief with slopes between 2 and 10%.

Consecuencia

Silting of network, pumping sump and treatment plant

Probabilidad

Probable

Alcance

Ligeramente perjudicial

Importancia del riesgo

Riesgo bajo

Amenazas naturales (hidrometeorológicas y geológicas)

Nombre de la amenaza

Crecidas repentinas, inundaciones

Exposición

Comentarios

According to the local hazard map, the water treatment plant is located in a flood prone area. Flood events occurred in 1986, 2002 and 2012. Approximately every 15 years.

Consecuencia

Damage of the wastewater treatment plant components such as pumping sump. Overflow of stabilization lagoons would contaminate crops near the plant

Probabilidad

Muy probable

Alcance

Sumamente perjudicial

Importancia del riesgo

Riesgo alto

Consecuencia

Damage to crops and animal fodder in surrounding areas due to flooding

Probabilidad

Probable

Alcance

Perjudicial

Importancia del riesgo

Riesgo medio

Nombre de la amenaza

Frío extremo

Exposición

No está claro

Comentarios

At the project site, between 90 to 180 days per year with frosts are observed, 3'835 m above sea level, average temperatures around 4°C, minimum temperatures until -10°C. It happens on average every 2 years.

Consecuencia

Problems in the operation of the plant and reduced efficiency of the oxidation lagoons

Probabilidad

Probable

Alcance

Perjudicial

Importancia del riesgo

Riesgo medio

Amenazas que se producen debido al cambio climático (y la variabilidad del clima)

Nombre de la amenaza

Cambios de frecuencia e intensidad de los fenómenos climáticos extremos y desastres relacionados (p.ej. olas de frío y calor, inundaciones, sequías, tormentas, huracanes, ciclones)

Exposición

No está claro

Comentarios

There are variations of extreme temperatures, mainly frost with a tendency to increase in the future

Consecuencia

It could affect the operation and efficiency of the wastewater treatment plant in oxidation lagoons

Probabilidad

Improbable

Alcance

Perjudicial

Importancia del riesgo

Riesgo bajo

¿Evaluación detallada de riesgos necesaria?

Sí - Es necesaria una evaluación detallada de riesgos

Perspectiva del impacto

Calcule el impacto en el medioambiente

Área medioambiental

Agua

Componente de la actividad

Wastewater treatment plant

Impacto sobre el medioambiente

Bad odors from the plant could disturb the surrounding population

Estime el impacto en los riesgos de desastres

Componente de la actividad

Wastewater treatment plant

Nuevo riesgo o riesgo agravado

Could be an incentive for the construction of new settlements in areas at risk from flooding

Calcule el impacto en el cambio climático

Componente de la actividad

Wastewater treatment plant

Impactos en el cambio climático

Greenhouse gas emissions from oxidation lagoons

¿Evaluación detallada de los impactos necesaria?

Sí - Es necesaria una evaluación detallada de los impactos